Back to services

Custom Software Development

We build software for the tasks of a specific business: enterprise systems, web applications and automation services integrated into your IT landscape.

Price
from ₽600,000
Timeline
from 90 days

What custom software development is

Custom development means creating software to one company’s requirements. Unlike an off-the-shelf product, the system mirrors your processes instead of forcing you to adapt to someone else’s. Companies turn to it when ready solutions do not cover the task, cost too much in licences or do not integrate with what already works.

  • Web applications and corporate portals
  • Accounting, planning and dispatch systems
  • Business process and document workflow automation
  • Integration buses and exchange between systems
  • Services based on artificial intelligence
  • Replacement of legacy and imported systems

Stages of software development

We work in a clear cycle, and the result of every stage is a verifiable artefact. First a pre-project survey: we study processes, users and existing systems and describe requirements. Then architecture and interface design, development in two-week iterations, testing, rollout and maintenance.

The client takes part at every stage: at the end of each iteration we show a working version on a staging environment. This protects against discovering after six months that the wrong thing was built.

Engagement models

For tasks with clear requirements a fixed price works: scope, deadline and cost are fixed in the contract. If requirements are refined along the way, we work on a time-and-materials basis — you pay for the team’s actual hours and manage priorities flexibly.

The third model is a dedicated team: an analyst, developers, a tester and a project manager work only on your product. It suits long-term development when you have no developers of your own or not enough of them.

What is included

Pre-project discovery
Web applications and portals
Accounting and planning systems
Process automation
System integrations
Legacy software replacement
Testing and documentation
Maintenance and growth

Pricing and plans

Pre-project survey

You need requirements, architecture and a budget

from ₽150,000
2–4 weeks
  • Process analysis
  • Requirements and specification
  • Solution architecture
  • Estimate and work plan
Discuss

Fixed-price project

A clear scope and requirements

from ₽600,000
from 3 months
  • Design
  • Development and testing
  • Rollout and training
  • Documentation
  • Warranty support
Discuss

Dedicated team

Long-term product development

from ₽400,000 per month
from 3 months
  • A team for the project’s tasks
  • Two-week sprints
  • Flexible priority management
  • Transparent time tracking
Discuss

The cost of software development depends on the scope of features, integrations and reliability requirements. A pre-project survey gives an exact estimate; its results stay with you even if you decide to build the system with another team.

Work stages

01

Discovery

We study the task, users and existing systems and capture requirements

02

Design

We prepare prototypes and architecture and agree on a staged estimate

03

UI design

We design the interface and approve key screens

04

Development

We build in iterations and show results on a staging server

05

Testing

We verify scenarios, load and security

06

Launch and support

We deploy, train your team and maintain the product

What the cost of software development depends on

A project’s price is determined by effort, and effort by scope and uncertainty. A system with clear requirements and typical features is estimated precisely. A project where requirements take shape along the way is estimated as a range that narrows after the survey.

The budget is affected by the number of roles and scenarios, integrations with existing systems, requirements for load, fault tolerance and security, and the need for mobile apps. Launching in phases, using ready components for typical tasks and showing results to users early all save money without losing quality.

How to choose a custom development contractor

Choosing a vendor is a decision for years: the system will have to be maintained and developed. When comparing proposals it is useful to look beyond the amount.

  • Does the contractor ask about the business or name a price straight away
  • Does the proposal have stages with verifiable results
  • Who will work on the project, and can you talk to them
  • How acceptance, warranty and transfer of rights are arranged
  • What happens if requirements change mid-project
  • Will you keep the documentation and repository access

Replacing imported and legacy software

Many companies run on systems the vendor no longer supports or that are written in outdated technologies. Replacing them in one leap is risky. We use gradual migration: the new system is deployed alongside the old one, features are moved one at a time, and data is synchronised both ways until the full switch.

This approach keeps the company working and allows a step back at any moment. Before starting we analyse the existing system: which features are really used, what data must be kept, what it is connected to. It often turns out a third of the functionality has not been needed for a long time.

Documentation and project handover

Software without documentation means dependence on specific people. We prepare documents as the project goes, not on the last day, so they match what was actually built.

  • Specification and business process description
  • Architecture diagram: components, links, data flows
  • API description for integrations
  • Deployment and update guide
  • User and administrator manuals
  • Backup and recovery procedure
  • A repository with change history and automated tests
  • A register of libraries and licences used

Technology stack

React
Next.js
TypeScript
Node.js
PostgreSQL
Redis
Docker
Python
Kubernetes

Client testimonials

MOLOTILO DIGITAL built an online lending platform for us from scratch. The project was delivered right on schedule, and the code quality exceeded our expectations. The security system and performance under high load were especially impressive.
Alexey Petrov
Technical Director · FinTech Solutions
Excellent team! The project was delivered on time and with high quality. Highly recommended!
Alexey Smirnov
CTO · TechCorp
Excellent team! The project was delivered on time and with high quality. Highly recommended!
Alexey Smirnov
CTO · TechCorp

Our advantages

Fixed price or T&M
Dedicated team
Demo every two weeks
The client owns the code
Contract and NDA
Warranty support

How we work

Contract and NDA

We work under a contract that lists the scope, timelines and price. We sign a non-disclosure agreement before discussing project details.

Staged payment

The project is split into stages with a clear deliverable. You pay for a stage and accept it on a staging server before the next one begins.

You own rights and access

Exclusive rights to the code and design, the repository, domain and hosting are registered to your company and handed over by a formal act.

Warranty and support

During the warranty period we fix defects in our work free of charge. After that we stay in touch: maintenance and further development under a separate contract.

Frequently asked questions

How much does custom software development cost?

+

Fixed-price projects start from ₽600,000. A dedicated team starts from ₽400,000 per month. A preliminary estimate is free; a detailed one comes from the survey stage.

How do you estimate timelines?

+

We break the project into tasks, estimate each in hours and add a risk reserve. Stage deadlines are fixed in the contract.

Who owns the rights to the software?

+

Exclusive rights to the code, design and documentation are transferred to you under the contract.

Can you join an existing project?

+

Yes. We audit the code and architecture, then take the project on for development or strengthen your team.

Which technologies do you use?

+

TypeScript, React, Next.js, Node.js, Python, PostgreSQL, Docker and Kubernetes. We choose the stack for the task and your team’s ability to maintain the system.

How is quality ensured?

+

Code review, automated tests, manual testing before every release, a separate staging environment and monitoring after launch.

Can we start with a small stage to test the contractor?

+

Yes, and we recommend it ourselves. A pre-project survey is a complete stage with its own value: you keep the requirements, architecture and estimate.

How are requirement changes handled?

+

With a fixed price, changes are formalised in an addendum with their effect on time and cost. With time and materials, priorities can be changed before each iteration.

What does warranty support cover?

+

Free fixing of defects in the delivered functionality during the warranty period stated in the contract. New features and requirement changes are estimated separately.

Where is the system hosted?

+

On your servers, in a Russian cloud or at a site of your choice. We help select infrastructure and set up deployment and monitoring.

Let’s discuss your project

Send a request — we will assess the task free of charge and send an estimate with stages and timelines. Pricing starts from ₽600,000.

Cost calculator

What we build
Design
Additional features
Preliminary cost
₽400,000 — ₽1,000,000
Timeline: 10–20 weeks

The calculation is sent with your request — a manager will prepare an exact estimate for your task.

Get a project estimate

One contact is enough: phone or email.